The design brief for this project was developed by JMP in consultation with the school’s design group, made up of students and staff.
The secondary school’s two- and three-storey buildings are naturally ventilated, with high levels of natural light, with a predicted BREEAM Very Good rating.
The buildings are arranged around a central concourse. Landscaped space between the teaching blocks creates informal teaching areas linked to the concourse. The school has a performing arts block, sports hall, specialist teaching facilities, and three main teaching blocks.
Open space connecting the main hall and performing arts segment acts as a forecourt for local people who use the school’s public facilities. The school is keen to develop community links, and provide community learning programmes and a range of other public services.
-
Type
Buildings
-
Sector
-
-
Location
Greenwich, London
-
Description
-
-
Client
VT Education and Skills
-
Size
20,571 sqm
-
Cost
£40 million
-
Team
John McAslan + Partners, Architect
Davis Langdon, Project Manager and Quantity Surveyor
BDP, Engineering
Balfour Beatty Construction Ltd, Contactor -
Status
Complete
-
Lavender Sure Start & Children's Centre

The Lavender Sure Start Children's Centre is a 1,000sqm neighbourhood nursery and ...
-
Craigmillar High School

This innovative High School and Library at Craigmillar, is in an important ...
-
Harris Academy

This 1,360-pupil secondary school near Croydon is one of the first wave of City ...
-
Thomas Tallis School Landscape

The new Thomas Tallis School on Kidbrooke Park Road, south-east London, currently ...
Title goes here